- TSS 102, telescopic connection
Do you want more information and pricing?
1 / 3
Trappeforbindelse Trapp-vegg
TSS 102, telescopic connection
TSS 102 stair connections consist of an outer tube and an inner tube. It contains of two hollow core sections, where the inner tube profile fits inside the outer tube. The inner tube will slide inside the outer tube and be pulled out and in to the recess in the wall. The inner tube is pulled out/in with a wire/return rope. The unit has a control line that indicate the correct position of the inner tube. As well as a hole for a locking bolt which ensures that the inner tube stays in the correct position.
The TSS units are specially suitable where the elements are supplied with a finished surface from the factory, e.g. terrazzo.
Invisible Connections TSS 102 is supplied in black steel or galvanized.
Capacity 100 kN, minimum landing thickness 265 mm at full capacity, 200 mm with reduced capacity.
Picture below shows TSS102 with built-in sound reducing box and vertical rubber flange. This solution reduces step sound transmission by 20-25 dB.

- Capacity
- 100 kN
- Minimum slab thickness
- 200 mm
- Weight, black steel
- 10.8 kg
- Weight, galvanised
- 11.15 kg
- Impact sound reduction
- 20-25 dB
- Surface
- Black steel, Galvanised
TSS 102 måltegning
- TSSRVK v1.6E — Calculationstool
- Memo nr 31 — Guidance, stair connections
- Memo nr 41 — Additional products, stair connections
- Memo nr 45 — Fire protection, stair connections
- Memo nr 47 — Impact sound transmission, stair connections
- Memo nr 54 — Technical specifications, stair connections
- Memo nr 55 — Anchoring reinforcement, stair connections
- Memo nr 64 — Anchoring reinforcement, units in pair, cc 250, stair connections
- Memo nr 65 — Anchoring reinforcement, stair connections - TSS 20 FA
- Memo nr 65 A — Anhoring reinforcement, stair connections - TSS 25 L
- Calcyl, Earthquake.
- Des Bull — Des Bull Report.
- Analyses of stairwells performace and damage during Wenchuan earthquake.
- Memo no 70 — iC solution for earthquake and stairs.
- Memo no 71 — iC solution for earthquake and stairs spreadsheet.
- Memo no 72 — iC solution for earthquake and stairs additional reinforcement.
Stairconnection Architects
Stairconnection Engineer
Stairconnection production
Stairconnection installation 1
Stairconnection installation 2
Stairconnection stairs in earthquake
Stairconnection earthquake installation